Before After
L_arrowR_arrow

2nd Floor

1st Floor

Basement

Boiler Room

The white box on the left is the tankless (on demand) water heater.

The green device to it's right is the radient mixer. You can see the tubes go into the concrete below it.

Below the heater is the dry well (covered by a lid).

home | reel | news | projects | login | contact
© 2008 Luciano DiGeronimo